Deck and siding project update.

January 31, 2011

From our contractor, Larry:

“We’re just finished with the siding on the 1st building and have started replacing windows in 107, 207 and 307. We are in the process of removing the shingles and sheetrock on the south side of the bumpout section. We lost time today as we found that some time in the past the window in 107 was moved improperly, with no header and no sill plate, leaving the structure weak and sagging from the weight of the floors above. We also found another set of wires wirenutted together and buried in the wall. We are installing a junction box to house the wire connectors with a cover plate to make them accessable as required. In the mean time, we are starting to shingle the face of that wall, starting from the corner out.”